Compare the actual 350i, debt contract and operating cash plan. Charter receipts after deductions can remain positive while failing to cover fixed commitments and loan payments.

A King Air 350i purchase should be evaluated as an aircraft, a debt contract and an operating plan. Twin turbines and an established model name do not establish borrower approval, engine coverage or a viable charter business. Identify the actual serial number, equipment, maintenance status and intended operation before comparing proposals. The current Beechcraft product page describes the King Air 360; its features should not be copied into a used 350i specification. Textron's August 2020 announcement describes the 360's cockpit and cabin changes relative to the 350i. Beechcraft: current King Air 360 product description Textron: August 2020 King Air 360 introduction
Identify the 350i and obtain candidate-specific pricing
Beechcraft's October 2015 Specification and Description covers units FL-1031 onward as stated in that document. The historical manufacturer-authored copy describes two PT6A-60A engines, a 15,000-pound maximum takeoff weight and single-pilot certification for its covered configuration. It is hosted on a third-party CDN and is a general evaluation reference, not the current approved manual for an aircraft. Do not apply its standard equipment or historical warranty to every earlier, modified or special-mission King Air. Beechcraft: historical October 2015 King Air 350i specification
Compare earlier 350, 350i, extended-range or modified aircraft, and the 360 in separate candidate records. Obtain the installed avionics, approved changes, engine and propeller identities, inspection schedule and records for each. A marketing name or panel photograph does not resolve those details. Nor does a manufacturer's newer product page prove that an older airframe has its autothrottle, pressurization controller or cabin configuration.
On October 23, 2026, 5x5 Trading's public page identified a 2015 350i, FL-980/N838UP, with price by inquiry. It described Pro Line 21 avionics and listed its two engines separately, with different total times. Its maintenance table included an in-progress phase-inspection entry. These are seller descriptions requiring reconciliation with current records, not an independent condition finding, confirmed availability or a numerical market price. No universal 350i value band is established here. 5x5 Trading: 2015 King Air 350i FL-980 seller description
Request a written price and an aircraft-specific value review. Separate the negotiated price from the lender's supported collateral value. If they differ, document the additional buyer cash rather than assuming the same advance percentage applies to every dollar of price. Compare the resulting funded condition, including known work, instead of treating the least expensive asking figure as the least expensive acquisition.
Compare principal, maturity and business obligations
The payment calculation needs principal, interest rate and amortization, while the contract also needs fees, maturity, balloon and prepayment provisions. AOPA Finance distinguishes amortization from the date the balance must be repaid. A long payment schedule does not commit a future refinance when a shorter contractual term ends. AOPA Finance: understanding loan terms Use the loan rates guide to organize complete proposals.
Prepare financial statements, existing debt, actual sources of equity and liquidity after closing. For business ownership, disclose the borrower, owner, operator, guarantees and intended use. The business financing guide explains questions to resolve with the reviewing lender and professional advisers. An entity name alone does not determine approval or remove personal obligations. No credit-score tier, equity percentage or model-specific rate is promised.
AirFleet Capital's FAQ describes different treatment of private versus leaseback or commercial use, connecting utilization with its financing structure. That is one provider's framework, not a guarantee of another lender's terms or a prediction of a candidate's depreciation. AirFleet Capital: financing FAQ and upgrade framework Present the actual use at the outset. A later change to charter or management arrangements should be reviewed against the loan, insurance and operating documents before relying on it.
Engines, pilots, insurance and charter are separate reviews
Inspect each engine's serial-specific records, hours, cycles, work history, applicable limits and upcoming events. A maintenance-program label does not prove that both engines have identical coverage or that an overdue account is settled. Pratt & Whitney's ESP transfer guidance calls for account information and a new owner's agreement/current rate; it also identifies deferred ESP Flex hours that cannot transfer at an aircraft transaction. Apply actual contract terms to the actual engines. Pratt & Whitney: buyer and seller ESP transfer guidance
Have a King Air-experienced provider define the prebuy inspection, including records, structure, pressurization, landing gear, propellers, avionics and known discrepancies. Separate the buyer's inspection findings from a seller's fresh-maintenance advertisement. Agree on estimates, responsibility, acceptance conditions and downtime before assuming work can be completed within a financing deadline.
Single-pilot aircraft certification does not establish a buyer's privileges or insurance acceptance. Section 61.31(a) addresses required type ratings; section 1.1 defines large aircraft using maximum certificated takeoff weight above 12,500 pounds. Review the actual configuration, pilot certificate, rating and limitations with a qualified training provider. 14 CFR 61.31: pilot rating and authorization limitations 14 CFR 1.1: large-aircraft definition Obtain written initial/recurrent training, mentor or additional-crew conditions from the insurer for the intended operation. See the insurance guide.
The FAA maintains a separate Part 135 operator-certification process. Loan approval is not operating authority, and purchasing an aircraft does not establish that it can immediately earn charter revenue. FAA: Part 135 operator certification framework Identify the proposed operator, aircraft acceptance process, crew, management agreement, maintenance responsibilities, scheduling priorities and insurance. Distinguish owner travel from revenue trips and account for positioning and unavailable days. Do not use a gross charter hourly rate as the owner's retained cash.
Worked example: charter receipts that do not cover debt
Every price, rate, operating amount and utilization input in this example is invented. It is not a 350i quote, charter forecast, lender test or operating-cost estimate. Suppose price is $5,000,000, equity is $1,000,000 and the loan is $4,000,000. A fixed 7.5% annual note rate with 180 monthly payments and no balloon gives approximately $37,080.49 monthly principal and interest. Twelve rounded payments total $444,965.88. The loan calculator guide explains the payment inputs.
Assume each revenue hour leaves $2,000 after all selected variable costs and management deductions. This is retained contribution in the example, not gross revenue or an observed charter margin. Assume another $300,000 of annual fixed cash commitments before debt. Do not add those same commitments to the hourly deduction again. The contribution definition and exclusions must be consistent across both scenarios.
| Selected measure | 500 revenue hours | 350 revenue hours |
|---|---|---|
| Contribution after selected variable deductions | $1,000,000 | $700,000 |
| Cash after $300,000 fixed commitments, before debt | $700,000 | $400,000 |
| Annual principal and interest | $444,965.88 | $444,965.88 |
| Cash available divided by debt service | 1.57 | 0.90 |
| Selected cash after debt | $255,034.12 | -$44,965.88 |
The ratio is calculated from this example's defined cash before debt; it is not a lender's approved debt-service-coverage calculation. A lender may define eligible income, adjustments, guarantees and obligations differently. The downside leaves a funding deficit despite positive retained contribution and positive cash before debt. A profitable-looking charter activity can therefore fail to support the selected ownership debt.
Under only these assumptions, annual contribution must cover $300,000 plus $444,965.88. Dividing by $2,000 gives 372.48 revenue hours, rounded to two decimals, for selected annual cash break-even. A hypothetical planning target of 1.25 times debt would require 428.10 hours, using the unrounded result before display rounding. Neither threshold establishes achievable demand, a required lender ratio or actual aircraft availability. Whole-hour plans must round upward, not treat the displayed decimal as sufficient flying.
For selected acquisition cash, add $40,000 closing expenses, $30,000 training and $200,000 retained funds to the $1,000,000 equity: $1,270,000 combined. Retained cash is still an asset, not already spent operating expense. The annual charter illustration begins after closing. It does not include every tax, maintenance event, owner trip, capital expense, resale effect or opportunity cost, and it does not make a business profitable by definition.
Build the calendar and utilization budget together
Obtain candidate-specific proposals for fuel, programs, insurance, storage, crew, recurrent training, subscriptions, management and inspections. Schedule known events by both calendar and utilization. Model lower revenue, additional positioning, delayed collections and longer downtime while fixed commitments and debt continue. The ownership cost guide provides categories; a generic hourly fuel figure cannot replace this schedule.
Separate amounts covered by a program from exclusions and aircraft work outside it. Confirm both engine accounts rather than multiplying an unexplained per-engine figure by two or treating a combined figure as an individual charge. Review what a management company's quote includes, who authorizes work and when the owner must fund invoices. An annual average can conceal a large bill before revenue arrives.
Use the loan requirements guide to prepare the borrower package and the step-up guide for transition planning. Send the candidate, use, pilot background, known work and timing through the financing inquiry. Separate financing acceptance, maintenance release, insurance effectiveness and operational readiness in the closing plan.
King Air 350i financing questions
How much do I need to put down on a King Air 350i?
The lender determines equity for the borrower, aircraft, supported value and use. The example's 20% is only a calculation input. Fees, training, inspections, known work and continuing liquidity require funding beyond that equity.
What is an engine program and why does it matter?
It is a contract for specified engine maintenance coverage and obligations. Review each engine, account status, transfer conditions, exclusions and new-owner pricing. A program name does not establish full coverage, a value premium or loan approval.
Can I finance a 350i for charter (Part 135)?
Submit the actual commercial-use request for lender review. Financing, insurer acceptance and FAA operating authority are separate. Document the operator, crew, management, maintenance and cash plan rather than assuming gross charter revenue pays the debt.
Do turboprop loans use balloon payments?
A proposal may have a maturity shorter than its payment amortization. Compare the written repayment date and remaining balance with a fully amortizing alternative. Future refinancing, sale proceeds and their timing are not guaranteed.
Are the rates in this guide guaranteed?
No. The 7.5% note rate is invented and is not an APR or offer. Jaken Aviation is an aircraft financing brokerage, a division of Jaken Finance Group. Actual approval and written terms require lender review.